USS Pasadena (SSN-752) returns to Naval Base Point Loma after a six-month deployment. The crew is visible on deck. The plant they stood watch over is not. U.S. Navy photo by Mass Communication Specialist 2nd Class Kyle Carlstrom.
I learned steam in the U.S. Navy’s nuclear power program, on submarines. Down there, the steam plant isn’t a utility. It’s the ship. Nobody had to build a business case for maintaining it, because there was no version of the mission where the plant was allowed to degrade. Reliability wasn’t a metric we reported. It was the condition of being alive.
Then I spent twenty-two years as a commissioned boiler inspector, walking into hospitals, food plants, campuses, and manufacturing floors across the Upper Midwest. Same physics. Very different reality.
Here is the thing I want to say plainly, because I don’t think it gets said enough: in a large number of the facilities I have inspected, the condition of the boiler room and the executive understanding of the boiler room are two different documents. The gap isn’t small. And decisions about capital, staffing, and risk are being made off the wrong one.
The paperwork says green. The room says otherwise.
A plant manager or a VP of facilities typically has two inputs about the heart of their operation: an annual jurisdictional inspection certificate, and a weekly or monthly log from the operating staff. Both are necessary. Neither one is a condition assessment, and that distinction gets lost somewhere between the boiler room and the boardroom.
The jurisdictional inspection answers a specific, narrow, important question: is this pressure vessel safe to operate under code? That is not the same question as is this plant efficient, reliable, correctly treated, and going to carry you through February? Nobody is paying for that second question to be asked, so mostly it isn’t.
I want to be careful here, because I work alongside these inspectors and I respect the job. The scope is the scope and the fee is the fee. Access is often genuinely limited — confined-space rules, short outage windows, a vessel that can’t be safely entered, a facility that scheduled the inspection for a Tuesday morning and wants the boiler back online by noon. Some inspections are as thorough as conditions allow. Others are box-checking, and everyone in the trade knows which is which. Either way, the certificate on the wall was never designed to tell an owner what shape their plant is in. It gets read that way anyway.
The weekly log has the same problem from the other direction. It records readings, not trends. Fifty-two weeks of “normal” tells you nothing if nobody is reading across the fifty-two.
The third input — the one that’s actually accurate — usually doesn’t survive the trip upstairs.
The operator or chief knows exactly what’s wrong. They have been saying so. But that message gets compressed at every level of the org chart until it lands on an executive’s desk as “the boiler room needs some work,” sitting next to a capital request that generates revenue. I understand which one wins. I’ve watched it happen for three decades.
What I actually find
The same boiler front, photographed seconds apart. Nothing in the visible image suggests a problem. The infrared reads 437°F — and that heat is not just wasted fuel. Temperatures like this at the burner plate point to failing internal refractory. Left alone, burner plates burn through, and an insulation reading becomes a major repair and a safety exposure. Photos by the author.
None of it is exotic. It is almost always the accumulation of small, deferred, unglamorous things:
Water treatment that driftedChemistry gets set up correctly, then a vendor changes, staff turns over, and nobody closes the loop. DOE puts a normal 1/32-inch waterside scale layer at roughly 2% additional fuel consumption, with up to 5% possible on firetube boilers. That’s a permanent tax you pay every hour the boiler fires.
A boiler tube in cross-section, its bore closed down by waterside scale. Two percent of a fuel bill, made physical. Photo by the author.
Steam leaks left runningNot because anyone is lazy — because there’s no line item for it and no outage window to fix it. DOE also reports that in systems not maintained for three to five years, 15% to 30% of installed steam traps have failed, against under 5% in plants with a real program.
A feed tank vent discharging live steam, in daylight, outside the building. Nobody was hiding it. Nobody was looking at it either. Photo by the author.
Insulation that never went back onAny surface over 120°F should be covered. Insulating it typically cuts that loss by about 90%.
Condensate going down the drainMore than 10% of your total steam energy, plus the water and the chemicals to treat its replacement, thrown away continuously, 24/7.
Repair-in-place on equipment that has aged outAt some point you are no longer maintaining an asset, you are subsidizing one. The repair invoices are individually small and collectively enormous — and because they’re OPEX, they never trigger the conversation a CAPEX request would.
Redundancy that exists on the drawing and not in the roomTwo boilers, one of which nobody has successfully fired since spring.
A feedwater tank with failed insulation, open to atmosphere. Oxygen enters the system here, and the corrosion it causes shows up somewhere else entirely — years later, as a repair invoice nobody connects back to this tank. Photo by the author.
For my healthcare readers, one line from the American Society for Health Care Engineering is worth sitting with: there are no regulatory requirements that require steam trap maintenance. Nothing outside your organization forces this. It is entirely on you.
The safety record points the same direction. In the National Board’s ten-year incident study covering 1992 through 2001, 83% of boiler accidents traced directly to human oversight or lack of knowledge — low-water condition, improper installation, improper repair, operator error, poor maintenance. Not metallurgy. Not bad luck. Attention.
A workforce problem before it’s an equipment problem
The people who could close this gap are retiring out of the trade. The Bureau of Labor Statistics counts roughly 33,300 stationary engineers and boiler operators in the entire United States, with about 3,800 openings a year — better than 11% annual turnover in an occupation that is barely growing. Hospitals are the single largest employer of them.
Thirty years of pattern recognition walks out the door with each of those people, and it does not get written down. The operator who knew that the number three feedwater pump sounds different when it’s about to go is not replaced by a log sheet.
The number I wish more executives saw
A U.S. Army CRREL field study measured an aging central steam distribution system and found that only 43.5% of the steam energy entering the distribution system actually reached the load. Just 46.2% of what left the plant came back as condensate. A modern low-temperature hot water distribution system, by contrast, runs distribution losses around 5%.
Read that again. More than half the fuel, gone between the plant and the point of use — in a plant that was passing its inspections.
Sidebar — by the numbers
43.5%Of steam energy entering an aging central distribution system reached the load. U.S. Army CRREL.
15–30%Failed steam traps in systems unmaintained 3–5 years. Under 5% with a program. U.S. DOE.
83%Of boiler accidents caused by human oversight, not metallurgy. National Board, 1992–2001.
3,800Annual openings against 33,300 stationary engineers nationwide. U.S. BLS.
This is why I push clients to stop asking “how do we repair the central plant?” and start asking a harder question: is a central steam plant still the right architecture for this campus? Decentralizing to modular, on-demand, point-of-use generation eliminates most of that distribution loss, shrinks the water and chemical load, removes standby losses on loads that never needed steam in the first place, and — not incidentally — reduces the number of skilled operating hours the plant demands at exactly the moment those hours are hardest to hire.
That isn’t a repair. That’s a capital decision, and it needs to be made by someone with a capital budget, working from good information.
What I’m actually asking of ownership and management
I understand the pull of revenue-generating capital. A new OR generates billable procedures. A line expansion has a payback you can defend in a board meeting. The boiler room generates nothing on paper — right up until the morning it stops, and then it turns out it was generating everything. You cannot sterilize an instrument without steam. You cannot make product without steam.
A dollar saved in the boiler room is worth several dollars of production it protects upstairs.
That’s the rule of thumb I’ve come to after thirty years of this. Ask your CFO what one hour of unplanned outage costs your operation, then set that number against what a proper plant assessment costs. It is not a close call.
Five things worth doing this quarter, none of which require a capital request:
Read your last three inspection reports side by side. Look at what recurs, not at what passed.
Ask your chief operator directly — not through a report — what they would fix first with $50,000, and why. Then ask what happened the last three times they raised it.
Get a real steam trap survey. Not a spot check, and not from a steam trap vendor. Population-wide, with a repair list and a dollar figure attached.
Pull a year of water chemistry logs and have someone independent read them.
Ask whether central steam is still the right answer for your campus — honestly, with numbers.
None of this is an indictment of your operators. They have usually been telling you. And it is not an indictment of your inspector, who was hired to answer a different question than the one you actually need answered.
It’s an invitation to go look at the room yourself, with someone who will tell you the truth about it.
Go look at the room — with someone who’ll tell you the truth.
A Steam System CRES Score is the condition assessment your inspection certificate was never meant to be: efficiency, reliability, water treatment, and safety, graded, with a prioritized repair list and real dollar figures. If any of this sounded like your plant, let’s walk it together.
Garrett Trapnell has spent three decades in and around high-pressure steam. He trained in the U.S. Navy’s nuclear power program and served aboard fast-attack submarines, studied geography and cartography at the University of Minnesota, and worked two years as a cartographic researcher before returning to steam — twenty-two years as a commissioned boiler inspector, and time as a licensed boiler operator. He is a Minnesota licensed Chief A boiler operator and U.S. DOE trained in energy assessment and steam trap survey. He founded Trap Energy Solutions in Shakopee, Minnesota, in 2018 — a Service-Disabled Veteran-Owned Small Business (SDVOSB) serving the Upper Midwest with installation, service, R-stamp repairs, and Steam System CRES assessments. Boiler Room Solutions for the 21st Century. · garrett@trap.energy · trapenergysolutions.com